+971 2 57 57 079 info@pogcm.com Mon–Sat, 8:30–18:00
Services / 6 disciplines

Six disciplines.
One accountable team.

From new construction to long-term maintenance, every PrestigeOne service is delivered by a single point of responsibility — with in-house engineers, transparent costing, and an HSE-led site culture.

01 General Contracting 02 Remodeling 03 MEP 04 Civil 05 AMC
01 — General Contracting

Turnkey
construction.

Single-contract delivery for new-build residential, commercial, industrial and institutional projects. We hold accountability for design coordination, procurement, civil and MEP works, finishes, commissioning and handover.

Our in-house cost engineers price against live UAE supplier rates, and our project managers run weekly cost-to-complete reporting — so owners see programme and cost risk early enough to act on it.

Active general contracting construction site in Abu Dhabi with RCC frame and tower crane

What's included

  • Design coordination and tender support
  • Permits, NOCs, Civil Defence and authority approvals
  • Substructure, RCC frame and superstructure
  • MEP rough-in and second-fix
  • Internal and external finishes
  • Joinery, glazing, façade and specialist trades
  • Testing, commissioning, snagging and handover
  • One-year defect liability period

Our process

  1. Brief & feasibility

    Scoping call, free site visit, rough order of magnitude.

  2. Design & cost

    Drawings, BOQ and lump-sum proposal — typically 5 working days.

  3. Mobilise

    Permits, site setup, HSE plan, supplier orders inside week one.

  4. Build & report

    Daily photos, weekly cost report, fortnightly client walk.

  5. Commission & handover

    Snagging closed pre-handover, manuals, training, DLP cover.

Common questions

What's included in a general contracting scope?
Project planning, design coordination, procurement, civil and structural works, MEP installation, finishes, commissioning and handover under a single contract — one point of responsibility for cost, programme and quality.
How long does a typical new-build take?
A G+1 villa runs 9–12 months. A G+4 mixed-use building runs 14–22 months. A medium-scale industrial shed runs 6–10 months. We commit to a stage-by-stage programme inside the contract.
Do you handle Estidama and Civil Defence approvals?
Yes — building permit, Estidama Pearl Rating compliance, Civil Defence, ADDC and municipality NOCs are all bundled inside the GC scope.
02 — Remodeling & Renovation

Renovate.
Refit. Renew.

Interior fit-outs, refurbishment and adaptive reuse for offices, villas, retail, F&B and hospitality — including phased works inside occupied buildings.

We specialise in fast-track programmes where the building has to stay live: out-of-hours works, dust-controlled enclosures, and trades sequenced around tenant schedules.

Completed office interior fit-out with bespoke joinery and decorative finishes

What's included

  • Office and corporate fit-outs (Cat A / Cat B)
  • Villa renovation and extension works
  • Retail and showroom fit-out
  • F&B kitchens, hospitality interiors
  • Demolition and waste management
  • Bespoke joinery, false ceilings, partitioning
  • Flooring, painting, wallpaper, decorative finishes
  • Bathroom and kitchen fittings

Our process

  1. Walk & measure

    Same-week site survey, photographic record, existing-services review.

  2. Concept & cost

    3D visuals where useful, line-itemed BOQ, value-engineering options.

  3. Programme & permits

    Landlord approvals, fit-out NOCs, civil defence sign-off.

  4. Build

    Phased works around occupancy, dust enclosures, out-of-hours noise sensitivity.

  5. Handover

    Final clean, snagging, photography, defect cover.

Common questions

How long does an office fit-out take?
A typical 10,000–20,000 ft² office fit-out in Abu Dhabi takes 10 to 16 weeks from drawings-released to handover, depending on long-lead joinery items, MEP scope and landlord approval cycles.
Can you work in a building that stays occupied?
Yes — phased works, out-of-hours scheduling, hoarding, dust enclosures and HEPA filtration are standard tools on our occupied-site programmes.
Do you provide a designer or work with one we appoint?
Both. We have an in-house design partner for fit-out and renovation, and we work seamlessly with independent architects and interior designers as a delivery contractor.
03 — MEP Installation

Systems
built to last.

Mechanical, electrical, plumbing and fire-fighting systems for new-build and retrofit — designed to ADDC and Civil Defence requirements, installed by trade-certified crews, and commissioned with documented test results.

From chiller plant and AHU rooms to LV distribution, plumbing risers and fire-alarm loops, every service is coordinated against the architectural and structural model before a single sleeve is cast — so ceiling voids stay serviceable, access panels land where they should, and the handover pack is complete on day one.

MEP installation — HVAC chiller plant, ductwork and electrical room by PrestigeOne UAE

What's included

  • HVAC: chillers, FCUs, AHUs, VRF and ducted splits
  • Plumbing: water supply, drainage, pumps, water tanks
  • Electrical: LV distribution, panels, lighting, sockets
  • Fire-fighting: sprinklers, hydrants, fire alarm
  • Low-voltage: data, CCTV, access control, BMS
  • Solar PV and energy-efficiency retrofits
  • Testing & commissioning, balancing reports
  • As-built drawings, O&M manuals, training

Our process

  1. Load & design

    Heat-load and electrical-load calculations, single-line diagrams.

  2. Coordination

    Clash detection against architectural and structural drawings.

  3. Procurement

    Tier-1 brands with documented warranties and local service support.

  4. Install

    Trade-trained crews; weekly QA walks; photographed concealed works.

  5. T&C and handover

    Independent testing, civil defence sign-off, balanced systems.

Common questions

Which HVAC brands do you specify?
We specify and install Daikin, Trane, Carrier, S-Klimat, York and Mitsubishi systems among others, with brand chosen on a per-project basis against load, lifecycle and warranty support.
Can you retrofit MEP in an existing building?
Yes. Retrofit projects — chiller replacement, electrical upgrades, FAS upgrades, BMS overlays — are a significant share of our MEP work, including phased shutdown planning.
Do you handle ADDC and Civil Defence sign-off?
Yes — ADDC, ADWEA, Civil Defence and Estidama submissions and inspections are handled in-house.
04 — Civil & Infrastructure

Foundations.
Frames. Roads.

Substructure, RCC frame, external works, drainage, roads and infrastructure — built to Abu Dhabi Municipality and Estidama specifications.

From shoring and dewatering to road kerbing and surface drainage, our civil teams cover the full earthworks-to-finishes spectrum with in-house formwork and rebar capacity.

Reinforced concrete frame, rebar works and tower crane on a PrestigeOne civil and infrastructure project in Abu Dhabi

What's included

  • Site clearance, shoring and dewatering
  • Excavation and earthworks
  • Pile caps, raft and strip foundations
  • Reinforced concrete frame
  • Block-work, plastering, screeding
  • External hardstanding, kerbing and asphalt
  • Surface and foul drainage, manholes
  • Boundary walls, gates, landscape hardworks

Our process

  1. Survey

    Topographic, geotechnical, services-trace as needed.

  2. Method statements

    Sequenced safe-work plans for every high-risk activity.

  3. Procurement

    Approved-supplier rebar, concrete (TDS-checked), aggregates.

  4. Execute

    Crack-controlled pours, cube testing, formwork inspections.

  5. Validate

    As-built survey, load testing where required, sign-off.

Common questions

Do you self-perform formwork and rebar?
Yes — formwork, steel-fixing and concrete pour supervision are in-house disciplines. This is core to controlling civil programme risk.
Can you build to Estidama Pearl ratings?
Yes. We deliver to Pearl-1 through Pearl-3 Estidama ratings, with documented supply-chain evidence for material credits.
Do you handle road, drainage and external works packages?
Yes — kerbing, asphalt, paving, surface drainage and connection to municipal networks are standard parts of our infrastructure scope.
05 — Annual Maintenance Contracts

The building
after handover.

Planned preventive maintenance, 24/7 reactive call-outs and minor works — bundled for a fixed annual fee. AMCs cover MEP, civil, finishes and specialist trades.

We design AMCs around what actually breaks. Reactive response targets are written into the contract, with monthly dashboards showing PPM compliance and reactive ticket trends.

PrestigeOne maintenance technician performing planned preventive maintenance under an AMC

What's included

  • Planned preventive maintenance (PPM) calendar
  • 24/7 reactive call-out with SLA response targets
  • HVAC, plumbing, electrical, fire systems
  • Civil and finishes repairs
  • Pest control, water-tank cleaning, lift servicing (subcontract)
  • Energy and consumption reporting
  • Annual condition survey and capex plan
  • Monthly performance dashboard

Coverage tiers

  1. Essential

    PPM only, reactive billed at agreed call-out rates.

  2. Comprehensive

    PPM + reactive bundled; consumables included; 8-hour SLA.

  3. Total Care

    Full coverage incl. parts + minor works budget; 4-hour SLA; dedicated technician.

Common questions

What does an AMC cover?
An AMC bundles planned preventive maintenance, reactive call-outs (24/7), MEP systems, civil and finishing repairs, HVAC servicing, plumbing, electrical and fire systems at a fixed monthly rate.
What is the response time for emergency call-outs?
For Comprehensive AMC, we commit to 8-hour response and same-day attendance for critical faults (no cooling, no water, fire system, electrical hazard). Total Care drops this to 4 hours.
Can you take over an AMC mid-cycle?
Yes. We routinely take over under-performing AMCs, starting with a free condition survey and a written stabilisation plan for the first 90 days.
13+ years operating in the UAE construction sector since 2012.
250+ projects delivered across residential, commercial, industrial and institutional sectors.
60+ specialists engineers, project managers, supervisors and tradespeople in-house.
24/7 cover for AMC clients, with documented SLA response times.
06 — Handyman Services

Small works.
Done properly.

A dedicated handyman team for the jobs that are too small for a main contractor to mobilise and too fiddly for a facilities desk to schedule — on call-out, on a recurring visit, or bundled into an AMC.

Same supervisors, same HSE paperwork, same sign-off standard as our construction sites. Every visit is logged, photographed and closed with a written report, so a landlord or building manager can see exactly what was done and when.

PrestigeOne handyman technician carrying out a repair in an Abu Dhabi office

What we fix

  • Doors, locks and ironmongery — alignment, replacement, closers
  • Tiling repairs, re-grouting and silicone renewal
  • Ceiling tiles, access panels and grid repairs
  • Painting, patch repairs and touch-up works
  • Plumbing fixes — taps, traps, leaks, blocked drains
  • Minor electrical — sockets, switches, light fittings
  • Furniture assembly, mounting and signage
  • Minor joinery and partition adjustments

How a call-out runs

  1. Log

    Call, WhatsApp or email. We confirm scope and a two-hour arrival window.

  2. Attend

    Uniformed technician, ID badge, access and permit handled on arrival.

  3. Fix or quote

    Fixed on site where possible; anything larger gets a written quotation same day.

  4. Report

    Photo before and after, materials used, signed job sheet, invoice on account.

Common questions

Is there a minimum job value?
No minimum for AMC clients. For one-off call-outs there is a standard attendance charge covering the first hour, quoted before we dispatch.
How fast can you attend?
Same or next working day for scheduled works. Emergency call-outs for AMC holders are covered by the SLA in the contract, including out of hours.
Can handyman work be added to an AMC?
Yes. Most clients bundle a monthly handyman allocation into the AMC — it is usually cheaper than paying per visit, and it keeps small defects from becoming capital works.
24/7 emergency response

Something fails at 2am.
We answer.

Burst pipe, power trip, AC failure, lockout — a duty engineer takes the call, not a voicemail box. Abu Dhabi and Dubai, 365 days a year.

Tell us about your project. We'll come back inside one business day.

Request a quote